8.7.2 Post Repair Verification and Record Keeping
Following repair, trolleys must be re-verified by a Competent Person. The report of the verification should be retained and cross referenced to the equipment’s historical records for inspection by the Competent Person or local enforcing authority.
Although not required by legislation, new trolleys will usually be issued with a manufacturer’s record of proof load testing in addition to, although possibly combined with, documents required by the national legislation. This document forms an important part of the record of the trolley. It should be retained and cross referenced to the trolley’s historical records for inspection by the Competent Person or local enforcing authority.